Tesla EV Charger Installation with Wall-Mounted Conduit
Project type
Residential EV Charger Installation
Home EV charging, fitted to an existing garage. LHP Electrical installed a Tesla wall charger with surface-mounted metal conduit running beneath the overhead storage rack and entering the charger from below. This project gallery follows the installation through to the installed unit.
1. Installation in progress
The LHP Electrical crew works along the garage wall beneath the overhead storage rack.
2. Conduit and charger wiring
The close-up shows the charger base and wiring before the front cover is fitted, with the metal conduit entering from below.
3. Wall patch work at the panel
An LHP Electrical crew member patches the wall beside the electrical panel at the conduit entry. This photo shows the work in progress.
4. Installed Tesla charger
The completed installation view shows the charger with its cable coiled around the unit and the conduit route extending along the garage wall toward the panel.