San Leandro Three-Meter Main Panel Upgrade — Permit to PG&E Connection
Project type
Three-meter main panel replacement and utility coordination
Location
San Leandro, CA
The property’s insurer required replacement of the existing main electrical panel in San Leandro. LHP Electrical handled the permit process through Alameda County Building Inspection Department, installed the new three-meter service equipment, and completed the associated conduit and wiring work.
We coordinated the inspection and PG&E electric release process through meter installation and reconnection. The supplied inspection card records PG&E Electric Release on October 29, 2025. These photos show the original equipment, the new meter bank before utility meters were installed, and the completed installation with three meters in place and the old panel removed.
Planning a main panel replacement or multi-meter service upgrade? Call or text LHP Electrical at 510-759-4942. Visit www.lhpelectrical.com.