Garage EV Charger Installation: From Panel to Finish
Project type
Residential EV Charger Installation
From the electrical panel to the garage charging location, follow an LHP Electrical installation through real project photos. The gallery shows our crew at work, the metal conduit route, wiring at the charger enclosure, and the installed Tesla charger.
1. Panel and conduit route
Our crew works at the garage electrical panel. Surface-mounted metal conduit rises beside the panel, passes above the door, and follows the garage wall toward the charger location.
2. Work at the charger location
The photos show our crew working at the wall-mounted charger enclosure. A close-up captures the incoming conduit and visible wiring before the charger body is fitted.
3. Installed charger
The finished view shows the Tesla charger mounted on the garage wall, its cable looped around the unit, and the metal conduit route extending back toward the panel.