Fremont Main Panel Relocation — Gas Meter Clearance Correction

Project type

Main panel relocation

Location

Fremont, CA

LHP Electrical was called to a main-panel upgrade in Fremont that had already been installed. PG&E had declined to energize it because the panel was less than three feet from the gas meter.

We removed the panel from that location, relocated it to the left, and rerouted the service conduit along the wall to the existing rooftop weatherhead connection point. After PG&E accepted the corrected location, electric service was reconnected.

The photos show the relocated meter-main, service conduit, gas meter and patched former panel opening. The Fremont Meter Release label is included with private details concealed.

Need help with a main panel replacement or relocation in Fremont? Call or text LHP Electrical at 510-759-4942.