Fremont Commercial Electrical: Two 400A / 480V Panels & Overhead EMT
Project type
Commercial Electrical | 400A / 480V Three-Phase Panels
Location
Fremont, California
Follow this Fremont commercial electrical project from overhead conduit routing to feeder pulling and panel wiring.
The scope connects the existing main electrical panel to two 400A, 480V, three-phase subpanels, with approximately 200 feet of 2-1/2-inch EMT conduit routed overhead. The crew used a scissor lift for high-ceiling conduit work.
These 12 authentic job-site photos document conduit preparation, overhead routing and supports, the two-panel layout, materials, feeder-pulling equipment, and wiring inside the panels. The images show the installation process and the LHP team at work.